Click here for big savings on our Autumn/Winter breaks!
Mittwoch, 10. Januar 2018

Dalriada Luxury Lodges – Drone Footage

Over the last month, our vision is becoming a reality.  

All 8 lodges and the office are now wind and watertight and almost ready for the scaffolding to come down. Alan Buchan Contractors Ltd guys were working over the festive period on the insides of the lodges.

Nicol of Skene guys have dug and filled the trenches for the water and electricity supply to the individual lodges.

BT Openreach have successfully installed the fibre optic broadband cable (2km to the exchange in Stonehaven) so our guests can enjoy a super fast connection when they stay with us.

Drone Footage by Alan Murray of Datmedia